PHE / Plumbing


Blog Detail Image

Project Flow Chart


  • Study of project
  • Preparation of Design Basis Report & Water demand and electrical load calculations.
  • Preparation of Plumbing Services Space planning & Schematic Drawings
  • Approval of DBR & Schematic Drawings by Client / Architect / Project Managers
  • Preparation of Design, Development Drawings
  • Preparation of Final DBR & Drawings
  • Preparation of Specifications and BOQ Tender drawing
  • Scrutiny of Tenders, if required and assistance to client for placement of order on vendor issuing of goods for construction drawing
  • Site visit, as per requirement
  • Assistance in getting As-Built Drawings from the vendor
  • .